Skip to Content

Production planning in a small company: from whiteboard to MRP

Production planning in a small company: when a board and Excel stop being enough, and MRP starts to pay off.
August 27, 2026 by
HADRON FOR BUSINESS SP Z O O, Tomasz Leppich
| No comments yet

A dry-erase board in the shift supervisor's office, magnets or sticky notes for each job, the daily scramble over what runs on the machine today and what waits until tomorrow. Sound familiar? Production planning in a small company almost always starts exactly like this, and for a long time it genuinely works. The problem shows up later, when the number of jobs grows, customers call asking about status, and the whole schedule lives in one person's head. In this article we walk through the three stages every production plan passes through: the board, the Excel spreadsheet and an MRP-class system, and above all the thresholds beyond which each of these stages starts to slow the company down instead of helping it.

The three stages of production planning almost every small company goes through

No company starts with an ERP system. The production plan grows together with the company, in stages, and each stage has a moment when it is the right tool and a moment when it starts to do harm. The problem is not the tool itself, but the fact that companies usually change stage a few months too late, only once the cost of staying on the old solution becomes painful.

Stage 1: the dry-erase board and sticky notes

The board works brilliantly when a handful of jobs are in progress at once, production runs on a single shift, and the planner can see the whole floor from one spot. Reordering takes a second: you move a note and it is done. It is the fastest possible way to plan, as long as it all fits in one head.

The limit of this stage is simple: the board has no memory. It does not know how many times a given job has changed its deadline, it does not calculate machine load ahead of time, and if the planner goes on holiday or falls ill, no one else can reconstruct the logic behind the arrangement of the notes. The board also does not scale to a second shift or a second hall, because that would need two boards that do not talk to each other.

Stage 2: Excel as the production plan

Excel is the natural next step once there are too many jobs to hold in your head, or once the production plan has to be visible to more than one person: to the sales team, the warehouse, sometimes the customer. The spreadsheet organises the data, lets you sort, filter and total the hours per workstation, and above all it leaves a trace: you can see what changed and when.

Excel's limit shows up in a different place than the board's. The spreadsheet does not recalculate itself. Changing the deadline of one job does not automatically shift the others that depend on the same machine or the same material. Someone has to do that by hand, and with dozens of jobs in progress they do it ever more slowly and with an ever greater risk of error. On top of that comes the classic versioning problem: two people edit two copies of the same file and no one knows which one is current.

Stage 3: MRP and scheduling inside a system

An MRP-class system, that is material requirements planning combined with job scheduling, comes into play when the production plan depends not only on machine availability but also on material availability, and when a single change in the job queue should automatically shift everything connected to it. The system does this for the planner, in real time, and shows the same version of the truth to everyone who needs it: production, the warehouse, sales.

Decision thresholds: when to change stage and when there is no need yet

Changing stage too early is an unnecessary cost and means rolling out a system where a well-built spreadsheet would have been enough. Changing stage too late means paying every day in the form of downtime, overtime and jobs delivered past their deadline. The table below shows rough thresholds beyond which the current tool starts to cost more than moving to the next one.

SignalThe board is still enoughTime for ExcelTime for MRP / a system
Number of jobs in progress at onceup to a fewa dozen to several dozenseveral dozen and more, with dependencies between them
Number of people planning production1 person1 to 2 people, with other departments needing visibilityseveral people or several departments at once
Number of machines or work centres1 to 2several, planned by handseveral and more, with branching operations
Deadline dependence on material availabilityrarely, or checked by eyechecked by hand for each jobcalculated automatically from requirements and stock
Cost of a single mistake in the planlow, easy to fix on the boardnoticeable, a fix means recalculating a few cellshigh without a system, because the error spreads across several jobs at once

The rule of thumb is simpler than it looks in the table: if answering the question "what is actually running in production today" requires a phone call, a walk across the floor or opening three tabs at once, that is a signal that the current stage can no longer keep up, regardless of how many people you employ.

Managing production orders: what breaks first

Before a company even starts to consider an MRP system, what usually breaks first is managing production orders as such, not material planning itself. The typical symptoms look like this:

  • Jobs get lost between the board, Excel and email. Part of the priority information lives in one place, part in another, and no one is sure which source is current.
  • Priorities change without a trace. A customer calls, a job jumps the queue, but no one records at the expense of which other job that happens.
  • Answering a customer's status question takes hours, not minutes. You have to ask on the floor, check the spreadsheet, sometimes call the warehouse.
  • The planner spends more time rearranging the plan than actually planning. Every change requires manually recalculating the knock-on effects for the next jobs in the queue.

Production scheduling when one machine is not enough

As long as all production passes through a single workstation, production scheduling on a board or in Excel reflects reality well enough. The situation changes when jobs pass through several work centres in a set order, and a delay at one workstation pushes back the start at the next. At that point recalculating the schedule by hand at every change stops paying off, because the number of dependencies grows faster than one person's ability to keep track of them in their head or in a spreadsheet.

How to move from a board or Excel to MRP without overdoing it

Moving to the next stage does not immediately mean a full APS-class system with scheduling down to the minute at every workstation. A sensible first step is a single shared production plan, visible to production, the warehouse and sales at the same time, based on bills of materials and current stock rather than on three parallel versions of the truth. Only on that foundation do you add automatic recalculation of material requirements, which is MRP proper.

We write more about what this approach looks like from the perspective of the whole production floor, including the MRP module and job scheduling, on our ERP for manufacturing page. You will find further articles on the digitisation stages of small manufacturing companies on our blog.

We have worked with Odoo since 2011, for clients in three countries: Poland, Germany and Belgium. Our first implementation began with a demo shown to the client the day after the first conversation, and we launched a working system after two weeks. That company was later acquired by a German listed group, and the same system core still runs there today. So we know from practice that moving from a board or Excel to a production planning system does not have to take months, provided the input data is in order.

Frequently asked questions

Does a small company with 10-20 employees even need an MRP system?

Not right away and not always. If production runs on a single shift, a few jobs are in progress, and one planner can see the whole picture from a board or a spreadsheet, a well-built Excel is perfectly enough. The need appears when the number of dependencies grows: between machines, materials and jobs, not when the number of employees alone grows.

How do you know the dry-erase board has stopped working?

The most common signal is having to make a phone call or walk across the floor to answer the question of what is actually running in production today. The second signal is a situation where the absence of one person, the one who "keeps it all in their head", means chaos in the job queue for a whole week.

Can you jump straight from a board to MRP, skipping Excel?

Yes, and for fast-growing companies it is often more sensible than building an ever more elaborate spreadsheet that within a year you will have to replace with a system anyway. There is one condition: the input data, the bills of materials, the material records and the stock levels, must be in order before the system starts calculating anything from them.

How long does moving from Excel to a system with an MRP module take?

It depends mainly on the quality of the input data, not on the implementation itself. A company with tidy bills of materials and material records launches the planning module relatively quickly. What usually takes the most time is not configuring the system but tidying up the data that has lived in several spreadsheet versions at once for years.

Before you decide which stage to move to, check exactly where today's production plan is costing you the most. Our Digital Growth Diagnosis measures 39 KPIs across 7 dimensions, including precisely this area: the planning of jobs, materials and production load, before you pay for any system at all.

HADRON FOR BUSINESS SP Z O O, Tomasz Leppich August 27, 2026
Share this post
Tags
Archive
Sign in to leave a comment
Comarch Optima to Odoo Migration: How It Works, How Long It Takes, What Happens to Data
See step by step how the move from Optima to Odoo works, with no data loss and no gap in invoicing.