Note for readers outside Poland: Dig.IT is a Polish grant for SMEs doing business in Poland (MŚP prowadzące działalność gospodarczą na terytorium RP). Companies operating in Poland, for example through a Polish subsidiary or branch, may qualify; the applicant must meet the SME and sector conditions, and ARP decides. SME status counts linked and partner enterprises, including a foreign parent company (Annex I to Regulation 651/2014). On 9 October 2026 ARP announced the Dig.IT call 2/2026, and it accepts applications from 2 to 30 November 2026. For a manufacturing company planning an Odoo implementation, the most important question is not "will we get the grant", but "which parts of the implementation can go into the project budget at all". The answer decides how much the company pays itself. And it pays everything first, because Dig.IT reimburses costs only after they are incurred.
This article walks through the scope of a typical Odoo implementation and splits it into three groups: what may be an eligible cost under the rules, what needs to be confirmed with ARP, and what the rules exclude outright. At the end there is a sample grant calculation on hypothetical figures. The programme rules come from the rules of call 2/2026 and the call page. Mapping Odoo modules to these rules is our interpretation, not ARP's position.
Source: ARP, digit.arp.pl (call page and rules of call 2/2026), as of 19.10.2026. The decision on the grant and on the eligibility of costs is ARP's.
Dig.IT 2/2026 at a glance
Deadline
Applications from 2 to 30 November 2026, through the SI Dig.IT system.
Who for
SMEs in industrial processing or production services, with at least 5 full closed fiscal years.
Amount
Dig.IT grant from 150,000 to 850,000 PLN, up to 50% of eligible net costs.
Revenue cap
Grant no more than 30% of average annual net sales revenue over 3 years.
Reimbursement
Paid in one payment, after the costs are incurred. No advances.
Mandatory scope
A ready-made digital technology with implementation, or software built to order.
Additional scope
Training, necessary equipment and materials, together up to 40% of eligible costs.
Outside the grant
VAT, application preparation, online marketing, the Odoo licence subscription.
Entry threshold
The minimum Dig.IT grant is 150,000 PLN. The grant covers at most 50% of the costs, so the project needs at least 300,000 PLN of eligible net costs, and average annual revenue of at least 500,000 PLN (30% cap).
Whether a company meets the conditions can be checked in a few minutes: the Dig.IT calculator.
Two routes to an eligible cost in a project with Odoo
The rules require the project to include at least one of two mandatory elements: purchase and implementation of ready-made digital technologies or commissioning software development work, i.e. software built to order. An Odoo implementation in a manufacturing company usually combines both: standard applications configured for the company's processes, and modules and integrations written specifically for it.
For both routes the rules set the same basic conditions. The technology:
- is used only by the applicant and serves the digital transformation of its business; the rights to it may not be transferred to another entity or made available onwards, for example under a licence,
- is depreciated under accounting law, as a rule until the end of the project's durability period,
- is an asset of the applicant and stays tied to the project until the end of the durability period,
- is bought at market terms from an entity not linked to the applicant (by capital, personally or in fact),
- complies with the EU Artificial Intelligence Act and is implemented within the cost eligibility period.
For software built to order there are additional conditions: the company can extend the solution in the future, the contract with the supplier covers all of the supplier's costs, the supplier is not linked to the company, and as part of the fee it transfers the economic copyrights to the software it creates to the company. Licence fees for software built to order are not eligible. In practice the transfer of rights concerns code written for the company, i.e. modules and integrations, not Odoo itself. The difference between configuration, a ready-made module and custom code is described in the article on integrations and custom modules.
The scope map: Odoo modules in three groups
The programme supports the digital transformation of manufacturing companies, not the purchase of software as such. That is why the strongest case can be made for the parts of Odoo that change how work is done on the shop floor, in the warehouse and in purchasing. The weakest for those that the rules exclude or whose eligibility depends on how they are bought.
Strong candidates for the budget
- ERP: one system for finance, sales, warehouse and production
- Sales: quotations, orders, invoicing (without marketing tools)
- Manufacturing (MRP) and order planning
- Warehouse, lots, serial numbers, barcodes
- Purchasing and supply for production
- Quality: control points and non-conformities
- Maintenance: machine inspections and breakdowns
- PLM: bill of materials versions
- Process automation: tasks, notifications and documents triggered by an event
- Integrations with machines and sensors
- Custom modules with transfer of rights
- Implementation work: configuration, data migration, testing
To confirm with ARP
- CRM: opportunities and customer contacts
- Online shop
- Tablets and shop floor terminals: the line between general-purpose and necessary equipment
Outside the grant
- Odoo licence subscription and hosting bought as a service: the company's own cost
- Email Marketing, Social Marketing, SMS Marketing, Marketing Automation
- A website used as a promotional tool
- Personal computers, printers, smartphones, furniture
- Application preparation and project settlement
- VAT, leasing, cash payments
- Staff and project management
- Licence fees for software built to order
- Spending from before the project start
This split is our working interpretation of the rules of call 2/2026. ARP assesses the eligibility of each cost based on the application and its attachments.
| Area | Odoo modules | Example of a process change | Group on the map |
|---|---|---|---|
| ERP: finance and costs | Accounting | Product cost calculated from production and purchasing, one data source for the whole company | Strong candidate |
| Sales | Sales, invoicing | Quotation, order and invoice in one flow, a customer order triggers planning | Strong candidate |
| Planning and production | Manufacturing (MRP), PLM | Orders with a bill of materials and routing instead of a spreadsheet, time and consumption recorded at the workstation | Strong candidate |
| Warehouse | Inventory, barcodes | Live stock levels, lots and serial numbers, stocktaking with a scanner | Strong candidate |
| Purchasing | Purchasing | Requirements calculated from the production plan, replenishment rules | Strong candidate |
| Quality | Quality | Control points on operations, alerts and a non-conformity report | Strong candidate |
| Machine maintenance | Maintenance | Preventive inspections and the breakdown history of each machine | Strong candidate |
| Shop floor data | IoT, custom integration | Reading counters, scales or sensors without retyping | Strong candidate, for custom code with transfer of rights |
| Automation | Automation rules, scheduled actions | Tasks, notifications and documents triggered by an event in the process, without manual chasing | Strong candidate |
| Licence and hosting | Odoo licence subscription, hosting as a service | Access to the system | Outside the grant, the company's own cost |
| Marketing | Email Marketing, Social Marketing, Marketing Automation | Online campaigns and promotion | Outside the grant |
The Odoo licence subscription: outside the Dig.IT project
The Odoo licence subscription is not part of the Dig.IT project; we plan it as the company's own cost. The same applies to hosting bought as a service. The rules require the technology to be depreciated and to be a company asset, while a subscription is a fee for access for the next period. That is why we base the project budget on implementation and development work and on items of the optional component, and the company includes the subscription in its cost plan next to the project.
Equipment, sensors and training: the optional component
Next to the mandatory part, the project may include an optional component, together up to 40% of eligible costs. Every cost in this part must be directly related to the technology being implemented and necessary for the project goals.
- Machines and devices as fixed assets, when the technology cannot be used without them and the company has no resources that could replace them. General-purpose equipment, such as personal computers, printers, smartphones or furniture, is not eligible.
- Materials and consumables that are not fixed assets. The rules give examples: sensors, code readers, locators, cabling.
- Staff training on using the new technology, delivered by an unlinked entity, for people employed under an employment contract. Internal and mandatory training, for example health and safety, does not count.
The same cost cannot go into both the mandatory and the optional part. Separately, the rules allow penetration tests and security audits in the implementation costs, if they are carried out by an external company specialising in cybersecurity, not linked to the applicant, and the results are documented in writing.
How to prepare the scope for the application
From the test to the money back: an order that cannot be reversed
1 / 4
Digital Maturity Test, a mandatory attachment to the application
2 / 4
Project scope and at least 3 price quotations
3 / 4
Application in the SI Dig.IT system, from 2 to 30 November 2026
4 / 4
After the agreement, delivery, then a one-off reimbursement
The project may not start before the application is submitted. Costs incurred before the project activities start are not eligible.
Before the scope goes into the application
Company eligibility. Main activity in industrial processing or production services, at least 5 full closed fiscal years, unused de minimis headroom. Quick check: the Dig.IT calculator.
Digital Maturity Test. The test result is a mandatory attachment to the application. How to do it properly is described in the article on the Digital Maturity Test.
Three quotations for the same scope. The rules require the value of costs to be estimated with at least 3 price quotations. The estimate stays valid for 3 months from the day the first quotation is received. Quotations describing the same scope are easier to compare and defend in the cost assessment.
Budget split into items. Implementation work, custom modules, equipment and training separately, the Odoo licence subscription outside the project budget. A doubtful item can then be removed without rewriting the whole budget.
No start before the application. It is safer not to sign binding orders or start work until the application is submitted. The rules define what counts as the project start.
Financing the whole. The grant is a reimbursement after the spending. The company first pays everything, including VAT, and the costs of a loan or credit to pre-finance the project are not eligible.
A sample calculation on hypothetical figures
This is an example, not an offer or a quotation. The company and the figures below are made up only to show the programme arithmetic. Real amounts come from the price quotations and the financial statements of a specific company.
The sample company is a metalworking plant with average annual net sales revenue over the last 3 years of 2,000,000 PLN. The Dig.IT project scope in this example:
| Budget item (example) | Component | Net amount in PLN |
|---|---|---|
| Odoo implementation: ERP, sales, production, warehouse, purchasing, quality, automation | mandatory | 480,000 |
| Custom module: integration with machines, with transfer of rights | mandatory | 220,000 |
| Sensors, code readers, cabling | optional | 60,000 |
| Staff training delivered by an unlinked entity | optional | 40,000 |
| Total eligible costs | 800,000 |
| Calculation step (example) | Result |
|---|---|
| 1. Share of the optional component: 100,000 of 800,000, i.e. 12.5%, the limit is 40% | met |
| 2. Half of the eligible net costs: 50% of 800,000 | 400,000 |
| 3. Revenue cap: 30% of average revenue of 2,000,000 | 600,000 |
| 4. Grant in this example: the lower of the amounts from steps 2 and 3 | 400,000 |
| 5. Programme range: from 150,000 to 850,000 | within range |
In this example the company first pays everything: 800,000 net plus VAT, and on top of that the costs outside the Dig.IT grant, for example application preparation and the Odoo licence subscription. After the project is settled, ARP reimburses 400,000 PLN in one payment in this example.
If the same company's average revenue were 1,000,000 PLN, the 30% cap would give 300,000 PLN and that would set the Dig.IT grant, even though half of the costs is 400,000 PLN. On 13 October 2026 ARP published a notice on how the maximum grant amount is calculated, so it is worth checking it on digit.arp.pl before entering the amount in the application.
Our assessment
In our view, the scope of an Odoo implementation for Dig.IT is best built from the problem on the shop floor, not from the list of eligible costs. A project that makes sense without the grant too, i.e. production, warehouse and purchasing in one system and machine data without retyping, is easier to justify in the application and easier to maintain during the durability period. Doubtful items are better confirmed with ARP or taken out of the budget before the application is submitted. The rules state plainly that approving the application and signing the agreement does not mean that all costs will be accepted and reimbursed. What happens after the agreement is signed is described in the article on settling the Dig.IT grant.
Related articles and pages
- Dig.IT call 2/2026: how to prepare a manufacturing company in 2 weeks, a preparation plan before the call opens.
- The Dig.IT application step by step, the stages of the application, the timeline and the most common mistakes.
- The Digital Maturity Test before Dig.IT, a mandatory attachment and the starting point for the plan.
- ERP grants in 2026, Dig.IT compared with regional programmes.
- Digitalizing a small manufacturing company: a 12 month plan, the order of steps before and after the grant.
- Dig.IT with Hadron for Business, how we combine an Odoo project with the Dig.IT programme.
- Dig.IT calculator, a quick check whether a company meets the call conditions.
Frequently asked questions
May an Odoo implementation be an eligible cost in Dig.IT 2/2026?
It may, if it meets the conditions of the call rules: the technology serves the digital transformation of the company, only the applicant uses it, it is depreciated and is a company asset until the end of the project's durability period, and the supplier is not a linked entity and works at market terms. ARP decides whether each cost is eligible.
Will the Dig.IT grant cover the Odoo licence subscription?
No. The Odoo licence subscription is not part of the Dig.IT project; we plan it as the company's own cost. The same applies to hosting bought as a service. The project budget is based on implementation and development work and on items of the optional component.
May an Odoo module written to order be an eligible cost?
It may, as commissioned software development work, if the economic copyrights to the code pass to the company, the solution can be extended in the future, the contract covers all of the supplier's costs, and the supplier is not a linked entity. Licence fees for software built to order are not eligible.
Do Odoo marketing modules fit into Dig.IT?
No. ARP excludes online marketing solutions, i.e. tools for online promotion and advertising, campaign management, analytics and personalisation of the marketing offer. Email Marketing, Social Marketing, SMS Marketing and Marketing Automation are not part of the project scope.
How large is the Dig.IT grant in call 2/2026?
The Dig.IT grant ranges from 150,000 to 850,000 PLN, up to 50% of eligible net costs and no more than 30% of the average annual net sales revenue of the last 3 years. It is paid in one payment, as a reimbursement after the costs are incurred, with no advances.
What is the smallest project in Dig.IT?
The minimum Dig.IT grant is 150,000 PLN. The grant covers at most 50% of the costs, so the project needs at least 300,000 PLN of eligible net costs, and average annual revenue of at least 500,000 PLN (30% cap).
Can the implementation start before the application is submitted?
No. The project may not start before the application is submitted, and costs incurred before the project activities start are not eligible. Before the application, however, the company can take the Digital Maturity Test, describe the scope and collect three price quotations.
Can the cost of writing the application go into the project budget?
No. Under the rules, the costs of preparing the application and attachments and of services for settling the project and reporting during the durability period are not eligible.
Source: ARP, digit.arp.pl, as of 19.10.2026. This content is for information only and does not replace the call rules. The decision on the grant is ARP's.
Planning an Odoo implementation in a manufacturing company in Poland and want to check which parts of the scope can go into the Dig.IT budget? Book a short call, and we will break the project down together: the scope module by module, split into what can go into the budget, and a price quotation that can be compared with two others. We have worked with Odoo since 2011. ARP decides on the grant.