A quote for a new order comes together in five minutes, because someone in the company "roughly knows" what a similar product cost half a year ago. The problem only surfaces once the supplier invoices land: more material went in than the quote assumed, the labour ran longer, and the margin that looked healthy on paper barely covered the costs in reality. This is the most common result of not having an organised product structure (BOM): the company can produce well, but it quotes and buys by feel. In this article we show what a BOM really is, using a piece of furniture and a steel structure as examples, and how order in the product structure turns into real money in quotes, purchasing and the warehouse.
What a BOM is, and why it is more than a shopping list
A BOM, short for bill of materials, is a complete, ordered description of what a given product is made of: every part, every sub-assembly, every quantity and unit of measure needed to make a single unit. A good product structure is not a one-off shopping list for today. It is a pattern that repeats with every new order for the same product, no matter who happens to be making it or whether they remember every detail from memory.
Product structure, illustrated with a piece of furniture
Take an upholstered armchair on a wooden frame. The BOM breaks it into levels: at the top sits the finished armchair, one unit. Below it come the sub-assemblies: the wooden frame, the reclining mechanism, the upholstered cushions. The wooden frame has a BOM of its own: battens of a specific cross-section and length, glue, screws, fittings. The upholstered cushion breaks down into fabric in running metres, foam of a defined density, thread. Without this breakdown into levels, every quote rests on a single number from memory instead of a sum of real line items.
Product structure, illustrated with a steel structure
The same logic works for steel structures, only the levels look different. A finished railing or gate breaks down into steel profiles of a specific cross-section and length, sheet metal, bolts, fasteners, a paint coat or galvanising. On top of that come welding time and painting time, which in steel structures can cost as much as the material itself. A company that does not have this written out in the product structure usually quotes on the weight of the structure and the estimator's experience, which works until the product changes or steel prices jump.
BOM, production recipe and routing: three different things
These three terms often get mixed up in conversations about production, even though they answer different questions.
BOM versus production recipe
A BOM describes discrete components: specific parts you can count in units or metres and physically find in the warehouse as separate items. A production recipe is a close cousin of the BOM, used where a product is made from proportions of ingredients that blend into a single mass and stop being distinguishable: glues, paints, mixes, food. Instead of "three screws and one batten", a recipe says "two kilograms of resin per hundred kilograms of mix". A company that makes furniture or steel structures usually needs a BOM above all, and recipes show up for the add-ons: varnishes, glues, coatings.
Routing
The production routing, or routing for short, answers a different question than the BOM: not what is needed, but in what order and at which workstation the product is made. For the armchair, the routing describes the sequence: cutting the battens, gluing the frame, fitting the mechanism, upholstering, packing, together with an indicative time at each stage. For a steel structure, the routing covers cutting, welding, grinding, painting or galvanising. The BOM says what a product is made of. The routing says how, and in what order, that product comes into being. Together they give the full picture: what to buy and how to turn it into a finished product.
What a good product structure actually fixes
Quotes without guesswork
When the BOM is complete and current, a quote for a new order is the sum of the line-item prices from the list plus the time from the routing, not a number from the estimator's memory. A change in the price of steel or fabric at the supplier feeds automatically into the cost of the whole product, so the margin in the offer matches reality on the day the offer goes out, not half a year earlier.
Purchasing without a "just in case" buffer
Without an organised BOM, the purchasing team orders with a buffer, because nobody is sure how much material will really go into production. With a good product structure, material requirements follow directly from the orders on the books: this many profiles, this many bolts, this much fabric, without guesswork and without cash frozen in surplus stock.
Material shortages and downtime
The most painful result of a missing BOM is a standstill on the shop floor when one item runs out that nobody thought of when ordering, because it never existed anywhere as a separate line on the list. A complete product structure forces a check of every item before a job starts, not just the ones someone happens to remember.
| Area | Without an organised BOM | With an organised BOM in the system |
|---|---|---|
| Quote for a new order | An estimate from memory or from a similar product made months ago | The sum of current line-item prices from the list and time from the routing |
| Reaction to a change in material price | Noticed only after the supplier invoice | Visible at once in the cost of every product that uses it |
| Orders with suppliers | With a "just in case" buffer, by eye | Follow directly from accepted orders and the BOM |
| Material shortages on the shop floor | Surface during production | Visible before a job starts, ready to check ahead of time |
| A change to the product design | You have to remember everywhere else the price and materials list need fixing | One change in the product structure updates the quote and the requirements |
From a single BOM to a system that keeps it in check
The first BOM can be built in a spreadsheet, and that is usually a good starting point: writing out the structure for even a handful of the most frequently made products already brings order to how you think about costs. The limit of a spreadsheet shows up the moment there are many structures, each several levels deep, and a change in the price of one material should recalculate automatically across dozens of products that use it. That is when the BOM naturally moves into an ERP system, where it connects with the routing, the stock level and the quote in one place, instead of living in a separate file that someone has to remember to update.
You can read more about how the product structure connects with material requirements planning and scheduling jobs on the shop floor on our page about ERP for manufacturing. You will find further pieces on organising production data on our blog. We have been implementing ERP systems on Odoo since 2011, for clients in three countries, Poland, Germany and Belgium. An organised BOM is usually one of the first foundations worth building the rest of a manufacturing company's system on.
Frequently asked questions
How does a BOM differ from a production recipe?
A BOM describes discrete components, that is, separate, countable parts and sub-assemblies you can identify individually in the warehouse. A production recipe describes proportions of ingredients that blend into a single mass and stop being distinguishable, as in glues, paints or mixes. A company that makes furniture or steel structures relies mainly on the BOM, while recipes usually apply to add-ons such as varnishes or coatings.
What is a routing, and does every company need one?
A routing describes the order of operations and workstations a product passes through on its way from material to finished product, together with an indicative time for each stage. A company with a very simple, single-step process can do without one for longer. A company where a product passes through several workstations in a set order needs a routing for time estimates and capacity planning to make any sense.
How do you build a first BOM if a company has never had one?
It is best to start with a few products that really recur most often in production, not the entire historical catalogue. For each of them you write out all the levels: the finished product, the sub-assemblies, the materials and parts at the very bottom, together with quantities and units of measure. Such a starting point, even in a spreadsheet, already brings order to quotes and shows exactly where the gaps in the data are.
Can a BOM be kept in Excel, or do you need an ERP system straight away?
You can, and for a few products that is a sensible start. The problem shows up when there are many structures, each several levels deep, and a change in the price of one material should automatically recalculate the cost of every product that uses it. That is when recalculating the spreadsheet by hand starts to cost more time than the spreadsheet is worth, and it is the natural moment to move the BOM into a system that keeps consistency on its own.
Before you start organising product structures, check how much today's missing BOM really costs you in quotes and purchasing. On our page about ERP for manufacturing we show how the product structure, the routing and material requirements planning come together into one system, instead of living in separate files that someone has to remember to update.